RAMS planning and management
RAMS and system safety plans, RAM targets apportioned to subsystems, and the RAMS activities scheduled against the EN 50126 lifecycle.
SYSTEM ASSURANCE & RAMS
Independent RAMS engineering, hazard analysis and safety case development for railway systems, aligned to EN 50126, EN 50129 and IEC 61508, from concept to entry into service.
WHAT WE DELIVER
We plan the RAMS programme, carry out the analyses, and assemble the evidence into a safety argument that regulators, assessors and operators can follow.
A note on terms: in railway engineering, RAMS means Reliability, Availability, Maintainability and Safety as defined in EN 50126, not construction "risk assessments and method statements".
RAMS and system safety plans, RAM targets apportioned to subsystems, and the RAMS activities scheduled against the EN 50126 lifecycle.
HAZID and HAZOP workshops, preliminary, system, subsystem and interface hazard analyses, and hazard log management through to verified closure.
FMEA/FMECA, fault tree analysis, reliability block diagrams, Markov models and reliability prediction, demonstrating RAM targets are achievable.
SIL determination using risk graphs or LOPA, tolerable hazard rate apportionment, and SIL allocation to safety functions under EN 50126-2 and IEC 61508.
Generic product, generic application and specific application safety cases to EN 50129, with GSN-structured arguments traced to evidence.
Technical review of supplier and contractor RAMS and safety submissions, gap analysis against the standards, and preparation of evidence for independent safety assessment.
STANDARDS
DELIVERABLES
HOW WE WORK
Define the system boundary, interfaces, operating context and the risk acceptance principles that apply.
Run hazard identification, then FMECA, FTA and RAM modelling to understand failure behaviour and risk.
Agree safety requirements and mitigations, allocate integrity levels, and verify each control is implemented.
Build the safety case, trace every claim to evidence, and close hazards with the right stakeholders.
FAQ
RAMS stands for Reliability, Availability, Maintainability and Safety. EN 50126 defines a lifecycle process for specifying and demonstrating these characteristics for railway systems, from concept through to decommissioning.
As early as the concept and system definition phases. RAM targets and safety requirements shape the architecture, and adding them late usually means rework and delayed approvals.
The RAMS plan sets out what will be done, by whom and when, to achieve and demonstrate RAMS. The safety case is the structured argument, supported by evidence, that the system is acceptably safe for its intended use.
Yes. We review supplier and contractor RAMS and safety submissions against the standards and your contract requirements, and give you a clear list of gaps and actions.
Our analysis work runs on Reliframe, our own platform, so FMECA, fault trees, hazard logs and requirements stay cross-linked. We also work in your toolset when a project requires it.